Reconstruction works for the replacement of main gas pipeline shut-off devices and connection to the remote control system SCADA

Elsis TS has signed a subcontract agreement with Šiaulių dujotiekio statybą UAB, which has won the tender „Reconstruction works for the replacement of the shut-off devices of the trunk gas pipelines and connection to the remote control system SCADA” announced by Amber Grid AB.

This project will be implemented in four phases, during which control device start-up and reception chambers will be installed in different branches of the trunk gas pipeline and operational technological control of the system will be implemented.

Elsis TS will carry out the installation, connection and programming of the remote control system SCADA, automation and control system, SCADA equipment under this contract.

Successful implementation of the project by introducing advanced infrastructure elements will allow to modernise the gas transmission system managed by Amber Grid AB and will increase the security and reliability of the natural gas transmission system.

The works are scheduled to be completed by 30 May 2023.